Dean Anna Valtonen visited in the Väre construction site

Posted on February 3, 2017February 3, 2017 by Sari Dhima

Dean Anna Valtonen visited in the Väre construction site on the 27th of January 2017.

In the picture on the right side there are Project Engineer Riku Lehtonen (A-insinöörit), Chief Architect Jussi Palva (Verstas Architects), Dean Anna Valtonen (Aalto ARTS) in the middle, Responsible Director Jarmo Wilander (ACRE) and Worksite Manager Jussi Lahti (SRV) on the left side.

Brickwork façade

Posted on February 3, 2017February 3, 2017 by Sari Dhima

Väre Worksite: Brickwork façade (27.1.2017)

Painted walls and window frames and sill

Posted on February 3, 2017February 3, 2017 by Sari Dhima

Väre Worksite survey: Painted walls and window frames and sill on the model room (25.1.2017).

Ceiling panels

Posted on February 3, 2017 by Sari Dhima

Väre Worksite survey: ceiling panels (25.1.2017)

Väre building & AALTO ARTS updated presentation

Posted on January 11, 2017January 24, 2017 by Sari Dhima

Väre building & AALTO ARTS updated presentation 11.1.2017

11.1.2017 Vare_SD

Vare 2016_SD

Glass façade

Posted on January 10, 2017January 10, 2017 by Sari Dhima

Väre Worksite survey: Glass façade (10.1.2017)

Staircase

Posted on January 3, 2017January 4, 2017 by Sari Dhima

Väre Worksite survey: staircase (3.1.2017)

 

Painted walls in the model room

Posted on January 3, 2017January 4, 2017 by Sari Dhima

Väre Worksite survey: painted walls in the model room (2.1.2017)

Ceiling installations of the model room

Posted on January 2, 2017January 4, 2017 by Sari Dhima

Väre Worksite survey: ceiling installations of the model room (2.1.2017)

Concrete floor in the model room

Posted on December 19, 2016January 4, 2017 by Sari Dhima

Väre Worksite survey: Concrete floor in the model room (19.12.2016)

Posts navigation

Older posts
Newer posts

About One Campus

The planning and construction of the new Väre building for the School of Art, Design, and Architecture (ARTS) at the Otaniemi campus, to be completed in 2018.

Construction site camera

See the latest photos from our web cam

Contact us

For questions and feedback, contact us at:
Sari Dhima, Head of One Campus project
sari.dhima@aalto.fi

School of Arts, Design, and Architecture
Aalto University
PO Box 31000
FI-00076 Aalto

One Campus

Aalto University ARTS Campus Developments